To The Moon
Home
News
TigerAI
Log In
Sign Up
MsSamKierayu876
Proud to be a woman
+Follow
Posts · 3
Posts · 3
Following · 0
Following · 0
Followers · 0
Followers · 0
MsSamKierayu876
MsSamKierayu876
·
04-07
Nice to know
Sorry, this post has been deleted
看
1.59K
回复
Comment
点赞
1
编组 21备份 2
Share
Report
MsSamKierayu876
MsSamKierayu876
·
04-07
Mark
Sorry, this post has been deleted
看
1.40K
回复
Comment
点赞
2
编组 21备份 2
Share
Report
MsSamKierayu876
MsSamKierayu876
·
04-05
Wow
AI computing power is a fatal flaw! Broadcom's director named "three major bottlenecks," suggesting the capacity shortage may persist until 2027.
博通高管点名AI供应链三大核心瓶颈:激光器、先进制程晶圆及PCB。受制于技术门槛与产能挤压,小型PCB交货周期已暴增至六个月,激光器良率不足30%。即便台积电现大规模扩产,因设备交期达12至18个月、2026年产能实际已被大厂锁定,新订单需排队至2027年,算力缺口将趋于常态化。
AI computing power is a fatal flaw! Broadcom's director named "three major bottlenecks," suggesting the capacity shortage may persist until 2027.
看
1.51K
回复
Comment
点赞
2
编组 21备份 2
Share
Report
Load more
No following yet
Most Discussed
{"i18n":{"language":"en_US"},"isCurrentUser":false,"userPageInfo":{"id":"4212352499387392","uuid":"4212352499387392","gmtCreate":1749249309854,"gmtModify":1787791250810,"name":"MsSamKierayu876","pinyin":"mssamkierayu876","introduction":"","introductionEn":null,"signature":"Proud to be a woman","avatar":"https://community-static.tradeup.com/news/40147ad4b4fea60e7c16295a9be0a1f8","hat":null,"hatId":null,"hatName":null,"vip":1,"status":2,"fanSize":0,"headSize":22,"tweetSize":3,"questionSize":0,"limitLevel":999,"accountStatus":4,"level":{"id":0,"name":"","nameTw":"","represent":"","factor":"","iconColor":"","bgColor":""},"themeCounts":0,"badgeCounts":0,"badges":[],"moderator":false,"superModerator":false,"manageSymbols":null,"badgeLevel":null,"boolIsFan":false,"boolIsHead":false,"favoriteSize":0,"symbols":null,"coverImage":null,"realNameVerified":"success","userBadges":[],"userBadgeCount":0,"currentWearingBadge":null,"individualDisplayBadges":null,"crmLevel":11,"crmLevelSwitch":0,"location":null,"starInvestorFollowerNum":0,"starInvestorFlag":false,"starInvestorOrderShareNum":0,"subscribeStarInvestorNum":14,"ror":null,"winRationPercentage":null,"showRor":false,"investmentPhilosophy":null,"starInvestorSubscribeFlag":false},"page":1,"watchlist":null,"tweetList":[{"id":551089018245120,"gmtCreate":1775564259961,"gmtModify":1775566983148,"author":{"id":"4212352499387392","authorId":"4212352499387392","name":"MsSamKierayu876","avatar":"https://community-static.tradeup.com/news/40147ad4b4fea60e7c16295a9be0a1f8","crmLevel":11,"crmLevelSwitch":0,"followedFlag":false,"idStr":"4212352499387392","authorIdStr":"4212352499387392"},"themes":[],"title":"","htmlText":"Nice to know ","listText":"Nice to know ","text":"Nice to know","images":[],"top":1,"highlighted":1,"essential":1,"paper":1,"likeSize":1,"commentSize":0,"repostSize":0,"link":"https://ttm.financial/post/551089018245120","repostId":"2625993708","repostType":2,"isVote":1,"tweetType":1,"viewCount":1588,"authorTweetTopStatus":1,"verified":2,"comments":[],"imageCount":0,"langContent":"EN","totalScore":0},{"id":551087593541840,"gmtCreate":1775564165799,"gmtModify":1775566974677,"author":{"id":"4212352499387392","authorId":"4212352499387392","name":"MsSamKierayu876","avatar":"https://community-static.tradeup.com/news/40147ad4b4fea60e7c16295a9be0a1f8","crmLevel":11,"crmLevelSwitch":0,"followedFlag":false,"idStr":"4212352499387392","authorIdStr":"4212352499387392"},"themes":[],"title":"","htmlText":"Mark ","listText":"Mark ","text":"Mark","images":[],"top":1,"highlighted":1,"essential":1,"paper":1,"likeSize":2,"commentSize":0,"repostSize":0,"link":"https://ttm.financial/post/551087593541840","repostId":"2625302879","repostType":2,"isVote":1,"tweetType":1,"viewCount":1398,"authorTweetTopStatus":1,"verified":2,"comments":[],"imageCount":0,"langContent":"EN","totalScore":0},{"id":550282748190936,"gmtCreate":1775372040774,"gmtModify":1775373506229,"author":{"id":"4212352499387392","authorId":"4212352499387392","name":"MsSamKierayu876","avatar":"https://community-static.tradeup.com/news/40147ad4b4fea60e7c16295a9be0a1f8","crmLevel":11,"crmLevelSwitch":0,"followedFlag":false,"idStr":"4212352499387392","authorIdStr":"4212352499387392"},"themes":[],"title":"","htmlText":"Wow ","listText":"Wow ","text":"Wow","images":[],"top":1,"highlighted":1,"essential":1,"paper":1,"likeSize":2,"commentSize":0,"repostSize":0,"link":"https://ttm.financial/post/550282748190936","repostId":"2625964592","repostType":2,"repost":{"id":"2625964592","kind":"highlight","weMediaInfo":{"introduction":"追踪全球财经热点,精选影响您财富的资讯,投资理财必备神器!","home_visible":1,"media_name":"华尔街见闻","id":"1084101182","head_image":"https://static.tigerbbs.com/66809d1f5c2e43e2bdf15820c6d6897e"},"pubTimestamp":1775373347,"share":"https://ttm.financial/m/news/2625964592?lang=en_US&edition=fundamental","pubTime":"2026-04-05 15:15","market":"us","language":"zh","title":"AI computing power is a fatal flaw! Broadcom's director named \"three major bottlenecks,\" suggesting the capacity shortage may persist until 2027.","url":"https://stock-news.laohu8.com/highlight/detail?id=2625964592","media":"华尔街见闻","summary":"博通高管点名AI供应链三大核心瓶颈:激光器、先进制程晶圆及PCB。受制于技术门槛与产能挤压,小型PCB交货周期已暴增至六个月,激光器良率不足30%。即便台积电现大规模扩产,因设备交期达12至18个月、2026年产能实际已被大厂锁定,新订单需排队至2027年,算力缺口将趋于常态化。","content":"<p><html><head></head><body>Broadcom executives have named three core bottlenecks in the AI supply chain: lasers, advanced process wafers, and PCBs. Due to technological barriers and capacity constraints, the delivery cycle of small PCBs has skyrocketed to six months, while the laser yield is less than 30%. Even though TSMC is currently expanding its production on a large scale, the computing power shortage will become the norm because the equipment delivery time is 12 to 18 months and the production capacity for 2026 has already been locked in by major manufacturers. New orders will have to wait until 2027.</p><p>Supply-side constraints on artificial intelligence computing infrastructure are spreading from front-end chip manufacturing to optical components and advanced packaging materials.<a href=\"https://laohu8.com/S/AVGO\">Broadcom</a>For the first time, executives have named three major bottlenecks in the AI supply chain, revealing that the real obstacles in this computing power arms race are far deeper than the market generally recognizes, and are difficult to resolve in the short term.</p><p><a href=\"https://laohu8.com/S/600455\">Broadcom</a>Natarajan Ramachandran, Director of Product Marketing at the physical layer, pointed out at a media briefing in Taipei on March 24 that the AI-related supply chain currently faces three core bottlenecks:<strong>Laser production capacity, wafers (specifically<a href=\"https://laohu8.com/S/TSM\">TSMC</a>Advanced manufacturing processes), and PCBs (Paddle Cards).</strong>The delivery cycle for small PCBs used inside high-speed optical transceivers has surged from about six weeks to about six months, and is not expected to ease until 2027.</p><p>The direct significance of the above statement for the market is that the investment boom in AI infrastructure cannot automatically resolve the structural constraints on the supply side. From the yield rate of less than 30% under rigorous laser testing, to the sluggish unit output in the early stages of TSMC's advanced packaging, and then to the PCB supplier switching certification cycle of more than six months—the combination of multiple bottlenecks means that the computing power capacity gap is very likely to continue in a structural manner, and supply chain price increases may become the norm.</p><p>Broadcom CEO Hock Tan also confirmed in the March earnings call that Broadcom has secured the supply of key components for 2026 to 2028, covering advanced process wafers, high-bandwidth memory (HBM) and substrates. This forward-looking plan itself is a direct reflection of the current level of supply shortages.</p><p><h2 id=\"id_982905332\">PCB delivery cycle increased tenfold</h2>In the 800G/1.6T advanced optical transceiver module, the PCB is used to connect external cables to internal cables.<a href=\"https://laohu8.com/S/600184\">photoelectric</a>Critical interfaces of components. Due to their extremely small space and the need to process extremely high-frequency signals, these small PCBs usually use the mSAP (Modified Semi-Additive Process) process, which has a much higher technical threshold than ordinary PCBs. They are mainly supplied by manufacturers with advanced HDI or IC substrate technology.</p><p>The root cause of PCB becoming a bottleneck lies in the overlap of processes.<strong>There is some overlap between its mSAP process and the IC substrate process required for AI servers. When the world rushed to buy HBM production capacity, the production capacity of small PCBs was squeezed.</strong>At the same time, the 1.6T module has extremely stringent requirements for signal quality, and the PCB must use ultra-low loss materials and precise impedance control, which is not something that ordinary PCB manufacturers can undertake.</p><p>More importantly, once the supplier is changed, the certification period can last for more than six months. That's exactly<a href=\"https://laohu8.com/S/GOOG\">Google</a>、<a href=\"https://laohu8.com/S/META\">Goal</a>The reasons why hyperscale cloud vendors prefer to sign long-term contracts of three to four years rather than lock in the production capacity of existing suppliers.</p><p><h2 id=\"id_2649859146\">Lasers: Yield less than 30%, indium phosphide production capacity a key bottleneck</h2>Laser elements have become another major bottleneck in the CPO (Co-Packaged Optics) era. To support 1.6T or higher bandwidth, lasers must maintain wavelength stability in the high-temperature environment of data centers, which places stringent demands on \"ultra-high power\" and \"extremely low noise\" continuous wave (CW) lasers.<strong>Even if a supplier is able to produce laser dies, the yield rate that meets the high CPO standards may be less than 30% after rigorous reliability testing.</strong></p><p>The constraints on production capacity are equally severe. High-power lasers rely on indium phosphide (InP) technology, and there are very few manufacturers in the world with the capability to mass-produce 6-inch InP. If upstream InP epitaxial wafer manufacturers or manufacturers with their own production capacity such as Coherent and Lumentum are fully booked, no matter how many downstream packaging manufacturers there are, there will be no laser dies available.</p><p>Deeper structural pressures come from the amplifying effect of the CPO architecture itself on laser demand. In traditional optical modules, one module is configured with one laser; In CPO solutions, in order to reduce the thermal impact, the industry has turned to the ELSFP (External Laser Source Module) architecture, which has resulted in a no longer linear relationship between the demand for laser dies and the number of switches, but has increased exponentially, directly impacting the already tight InP epitaxial capacity.</p><p><h2 id=\"id_1927327658\">Wafers and Advanced Packaging: The Real \"Super Big Traffic Jam\" in the Back Lane</h2>Regarding wafer supply, Natarajan Ramachandran directly stated that \"TSMC's production capacity has reached its limit\" and expects TSMC's advanced process production lines to reach a bottleneck in 2026, although TSMC plans to continue expanding production until 2027.</p><p><strong>However, the real \"super traffic jam\" occurs in the back-end advanced packaging process.</strong>Entering the CPO era, TSMC must introduce COUPE (Compact Universal Photonic Engine) technology, which uses Hybrid Bonding to three-dimensionally stack optical chips and silicon chips. This new packaging technology is extremely difficult and has an extremely long testing cycle, making it difficult to rapidly improve the initial unit output (UPH) of the equipment.</p><p>The competitive landscape has further exacerbated production capacity pressure. In 2026, Broadcom's production capacity competitors will no longer be just traditional network communication vendors, but...<a href=\"https://laohu8.com/S/NVDA\">NVIDIA</a>、<a href=\"https://laohu8.com/S/AAPL\">Apple</a>、<a href=\"https://laohu8.com/S/AMD\">AMD</a>、<a href=\"https://laohu8.com/S/QCOM\">Qualcomm</a>And those currently investing heavily in self-developed ASIC chips<a href=\"https://laohu8.com/S/GOOGL\">Google</a>, Meta, OpenAI. When the most advanced AI computing chips and the highest-end 1.6T network switches simultaneously flood into the same TSMC production line, production capacity has essentially entered a \"rationing system\".</p><p>Even if TSMC now decides to expand production on a large scale, factory construction, cleanroom completion, and the introduction of...<a href=\"https://laohu8.com/S/ASML\">ASML</a>The delivery cycle of extreme ultraviolet (EUV) lithography equipment and various high-end testing equipment often takes twelve to eighteen months.<strong>This means that the production capacity for 2026 has actually been locked in by major manufacturers between 2024 and 2025—customers who are only placing additional orders now will have to wait until the new production capacity is released in 2027.</strong></p><p><h2 id=\"id_3949521928\">Spillover across the entire supply chain: Second-tier suppliers lag behind in expanding production, and bottlenecks spread.</h2>Production capacity pressure is spilling over into the entire supply chain. Advanced packaging is not just a matter for packaging manufacturers; the steps that truly create bottlenecks include:<strong>CoWoS must be equipped with ABF substrates, Underfill essential for advanced packaging, heat dissipation requirements brought about by AI power consumption explosion, KGD testing and aging testing (Burn-in), CPO and optical modules, as well as cutting and drilling of TSV and interposer layers.</strong></p><p>TSMC Chairman Wei Zhejia once said that \"CoWoS production capacity is still insufficient\"—what he lacks is not funds, but the production capacity of supporting suppliers: substrate manufacturers, probe card manufacturers, underfill suppliers, etc. TSMC can invest heavily in building factories, but it cannot force these small and medium-sized suppliers to double their production capacity in the short term. Expanding ABF substrate production often takes two to three years, the aging testing time is extremely long, and the alignment tolerance of the fiber array is at the sub-micron level, making it difficult to fully automate—every step slows down the overall pace.</p><p>As Nvidia continues to advance the hardware iteration of its GPU architecture, supply chain bottlenecks and price increases may become structural norms rather than cyclical disruptions. For investors, the bottleneck in production capacity is precisely where pricing power is concentrated.</p><p></body></html></p>","collect":0,"html":"<!DOCTYPE html>\n<html>\n<head>\n<meta http-equiv=\"Content-Type\" content=\"text/html; charset=utf-8\" />\n<meta name=\"viewport\" content=\"width=device-width,initial-scale=1.0,minimum-scale=1.0,maximum-scale=1.0,user-scalable=no\"/>\n<meta name=\"format-detection\" content=\"telephone=no,email=no,address=no\" />\n<title>AI computing power is a fatal flaw! Broadcom's director named \"three major bottlenecks,\" suggesting the capacity shortage may persist until 2027.</title>\n<style type=\"text/css\">\na,abbr,acronym,address,applet,article,aside,audio,b,big,blockquote,body,canvas,caption,center,cite,code,dd,del,details,dfn,div,dl,dt,\nem,embed,fieldset,figcaption,figure,footer,form,h1,h2,h3,h4,h5,h6,header,hgroup,html,i,iframe,img,ins,kbd,label,legend,li,mark,menu,nav,\nobject,ol,output,p,pre,q,ruby,s,samp,section,small,span,strike,strong,sub,summary,sup,table,tbody,td,tfoot,th,thead,time,tr,tt,u,ul,var,video{ font:inherit;margin:0;padding:0;vertical-align:baseline;border:0 }\nbody{ font-size:16px; line-height:1.5; color:#999; background:transparent; }\n.wrapper{ overflow:hidden;word-break:break-all;padding:10px; }\nh1,h2{ font-weight:normal; line-height:1.35; margin-bottom:.6em; }\nh3,h4,h5,h6{ line-height:1.35; margin-bottom:1em; }\nh1{ font-size:24px; }\nh2{ font-size:20px; }\nh3{ font-size:18px; }\nh4{ font-size:16px; }\nh5{ font-size:14px; }\nh6{ font-size:12px; }\np,ul,ol,blockquote,dl,table{ margin:1.2em 0; }\nul,ol{ margin-left:2em; }\nul{ list-style:disc; }\nol{ list-style:decimal; }\nli,li p{ margin:10px 0;}\nimg{ max-width:100%;display:block;margin:0 auto 1em; }\nblockquote{ color:#B5B2B1; border-left:3px solid #aaa; padding:1em; }\nstrong,b{font-weight:bold;}\nem,i{font-style:italic;}\ntable{ width:100%;border-collapse:collapse;border-spacing:1px;margin:1em 0;font-size:.9em; }\nth,td{ padding:5px;text-align:left;border:1px solid #aaa; }\nth{ font-weight:bold;background:#5d5d5d; }\n.symbol-link{font-weight:bold;}\n/* header{ border-bottom:1px solid #494756; } */\n.title{ margin:0 0 8px;line-height:1.3;color:#ddd; }\n.meta {color:#5e5c6d;font-size:13px;margin:0 0 .5em; }\na{text-decoration:none; color:#2a4b87;}\n.meta .head { display: inline-block; overflow: hidden}\n.head .h-thumb { width: 30px; height: 30px; margin: 0; padding: 0; border-radius: 50%; float: left;}\n.head .h-content { margin: 0; padding: 0 0 0 9px; float: left;}\n.head .h-name {font-size: 13px; color: #eee; margin: 0;}\n.head .h-time {font-size: 12.5px; color: #7E829C; margin: 0;}\n.small {font-size: 12.5px; display: inline-block; transform: scale(0.9); -webkit-transform: scale(0.9); transform-origin: left; -webkit-transform-origin: left;}\n.smaller {font-size: 12.5px; display: inline-block; transform: scale(0.8); -webkit-transform: scale(0.8); transform-origin: left; -webkit-transform-origin: left;}\n.bt-text {font-size: 12px;margin: 1.5em 0 0 0}\n.bt-text p {margin: 0}\n</style>\n</head>\n<body>\n<div class=\"wrapper\">\n<header>\n<h2 class=\"title\">\nAI computing power is a fatal flaw! Broadcom's director named \"three major bottlenecks,\" suggesting the capacity shortage may persist until 2027.\n</h2>\n<h4 class=\"meta\">\n<a class=\"head\" href=\"https://laohu8.com/wemedia/1084101182\">\n\n<div class=\"h-thumb\" style=\"background-image:url(https://static.tigerbbs.com/66809d1f5c2e43e2bdf15820c6d6897e);background-size:cover;\"></div>\n\n<div class=\"h-content\">\n<p class=\"h-name\">华尔街见闻 </p>\n<p class=\"h-time smaller\">2026-04-05 15:15</p>\n</div>\n</a>\n</h4>\n</header>\n<article>\n<p><html><head></head><body>Broadcom executives have named three core bottlenecks in the AI supply chain: lasers, advanced process wafers, and PCBs. Due to technological barriers and capacity constraints, the delivery cycle of small PCBs has skyrocketed to six months, while the laser yield is less than 30%. Even though TSMC is currently expanding its production on a large scale, the computing power shortage will become the norm because the equipment delivery time is 12 to 18 months and the production capacity for 2026 has already been locked in by major manufacturers. New orders will have to wait until 2027.</p><p>Supply-side constraints on artificial intelligence computing infrastructure are spreading from front-end chip manufacturing to optical components and advanced packaging materials.<a href=\"https://laohu8.com/S/AVGO\">Broadcom</a>For the first time, executives have named three major bottlenecks in the AI supply chain, revealing that the real obstacles in this computing power arms race are far deeper than the market generally recognizes, and are difficult to resolve in the short term.</p><p><a href=\"https://laohu8.com/S/600455\">Broadcom</a>Natarajan Ramachandran, Director of Product Marketing at the physical layer, pointed out at a media briefing in Taipei on March 24 that the AI-related supply chain currently faces three core bottlenecks:<strong>Laser production capacity, wafers (specifically<a href=\"https://laohu8.com/S/TSM\">TSMC</a>Advanced manufacturing processes), and PCBs (Paddle Cards).</strong>The delivery cycle for small PCBs used inside high-speed optical transceivers has surged from about six weeks to about six months, and is not expected to ease until 2027.</p><p>The direct significance of the above statement for the market is that the investment boom in AI infrastructure cannot automatically resolve the structural constraints on the supply side. From the yield rate of less than 30% under rigorous laser testing, to the sluggish unit output in the early stages of TSMC's advanced packaging, and then to the PCB supplier switching certification cycle of more than six months—the combination of multiple bottlenecks means that the computing power capacity gap is very likely to continue in a structural manner, and supply chain price increases may become the norm.</p><p>Broadcom CEO Hock Tan also confirmed in the March earnings call that Broadcom has secured the supply of key components for 2026 to 2028, covering advanced process wafers, high-bandwidth memory (HBM) and substrates. This forward-looking plan itself is a direct reflection of the current level of supply shortages.</p><p><h2 id=\"id_982905332\">PCB delivery cycle increased tenfold</h2>In the 800G/1.6T advanced optical transceiver module, the PCB is used to connect external cables to internal cables.<a href=\"https://laohu8.com/S/600184\">photoelectric</a>Critical interfaces of components. Due to their extremely small space and the need to process extremely high-frequency signals, these small PCBs usually use the mSAP (Modified Semi-Additive Process) process, which has a much higher technical threshold than ordinary PCBs. They are mainly supplied by manufacturers with advanced HDI or IC substrate technology.</p><p>The root cause of PCB becoming a bottleneck lies in the overlap of processes.<strong>There is some overlap between its mSAP process and the IC substrate process required for AI servers. When the world rushed to buy HBM production capacity, the production capacity of small PCBs was squeezed.</strong>At the same time, the 1.6T module has extremely stringent requirements for signal quality, and the PCB must use ultra-low loss materials and precise impedance control, which is not something that ordinary PCB manufacturers can undertake.</p><p>More importantly, once the supplier is changed, the certification period can last for more than six months. That's exactly<a href=\"https://laohu8.com/S/GOOG\">Google</a>、<a href=\"https://laohu8.com/S/META\">Goal</a>The reasons why hyperscale cloud vendors prefer to sign long-term contracts of three to four years rather than lock in the production capacity of existing suppliers.</p><p><h2 id=\"id_2649859146\">Lasers: Yield less than 30%, indium phosphide production capacity a key bottleneck</h2>Laser elements have become another major bottleneck in the CPO (Co-Packaged Optics) era. To support 1.6T or higher bandwidth, lasers must maintain wavelength stability in the high-temperature environment of data centers, which places stringent demands on \"ultra-high power\" and \"extremely low noise\" continuous wave (CW) lasers.<strong>Even if a supplier is able to produce laser dies, the yield rate that meets the high CPO standards may be less than 30% after rigorous reliability testing.</strong></p><p>The constraints on production capacity are equally severe. High-power lasers rely on indium phosphide (InP) technology, and there are very few manufacturers in the world with the capability to mass-produce 6-inch InP. If upstream InP epitaxial wafer manufacturers or manufacturers with their own production capacity such as Coherent and Lumentum are fully booked, no matter how many downstream packaging manufacturers there are, there will be no laser dies available.</p><p>Deeper structural pressures come from the amplifying effect of the CPO architecture itself on laser demand. In traditional optical modules, one module is configured with one laser; In CPO solutions, in order to reduce the thermal impact, the industry has turned to the ELSFP (External Laser Source Module) architecture, which has resulted in a no longer linear relationship between the demand for laser dies and the number of switches, but has increased exponentially, directly impacting the already tight InP epitaxial capacity.</p><p><h2 id=\"id_1927327658\">Wafers and Advanced Packaging: The Real \"Super Big Traffic Jam\" in the Back Lane</h2>Regarding wafer supply, Natarajan Ramachandran directly stated that \"TSMC's production capacity has reached its limit\" and expects TSMC's advanced process production lines to reach a bottleneck in 2026, although TSMC plans to continue expanding production until 2027.</p><p><strong>However, the real \"super traffic jam\" occurs in the back-end advanced packaging process.</strong>Entering the CPO era, TSMC must introduce COUPE (Compact Universal Photonic Engine) technology, which uses Hybrid Bonding to three-dimensionally stack optical chips and silicon chips. This new packaging technology is extremely difficult and has an extremely long testing cycle, making it difficult to rapidly improve the initial unit output (UPH) of the equipment.</p><p>The competitive landscape has further exacerbated production capacity pressure. In 2026, Broadcom's production capacity competitors will no longer be just traditional network communication vendors, but...<a href=\"https://laohu8.com/S/NVDA\">NVIDIA</a>、<a href=\"https://laohu8.com/S/AAPL\">Apple</a>、<a href=\"https://laohu8.com/S/AMD\">AMD</a>、<a href=\"https://laohu8.com/S/QCOM\">Qualcomm</a>And those currently investing heavily in self-developed ASIC chips<a href=\"https://laohu8.com/S/GOOGL\">Google</a>, Meta, OpenAI. When the most advanced AI computing chips and the highest-end 1.6T network switches simultaneously flood into the same TSMC production line, production capacity has essentially entered a \"rationing system\".</p><p>Even if TSMC now decides to expand production on a large scale, factory construction, cleanroom completion, and the introduction of...<a href=\"https://laohu8.com/S/ASML\">ASML</a>The delivery cycle of extreme ultraviolet (EUV) lithography equipment and various high-end testing equipment often takes twelve to eighteen months.<strong>This means that the production capacity for 2026 has actually been locked in by major manufacturers between 2024 and 2025—customers who are only placing additional orders now will have to wait until the new production capacity is released in 2027.</strong></p><p><h2 id=\"id_3949521928\">Spillover across the entire supply chain: Second-tier suppliers lag behind in expanding production, and bottlenecks spread.</h2>Production capacity pressure is spilling over into the entire supply chain. Advanced packaging is not just a matter for packaging manufacturers; the steps that truly create bottlenecks include:<strong>CoWoS must be equipped with ABF substrates, Underfill essential for advanced packaging, heat dissipation requirements brought about by AI power consumption explosion, KGD testing and aging testing (Burn-in), CPO and optical modules, as well as cutting and drilling of TSV and interposer layers.</strong></p><p>TSMC Chairman Wei Zhejia once said that \"CoWoS production capacity is still insufficient\"—what he lacks is not funds, but the production capacity of supporting suppliers: substrate manufacturers, probe card manufacturers, underfill suppliers, etc. TSMC can invest heavily in building factories, but it cannot force these small and medium-sized suppliers to double their production capacity in the short term. Expanding ABF substrate production often takes two to three years, the aging testing time is extremely long, and the alignment tolerance of the fiber array is at the sub-micron level, making it difficult to fully automate—every step slows down the overall pace.</p><p>As Nvidia continues to advance the hardware iteration of its GPU architecture, supply chain bottlenecks and price increases may become structural norms rather than cyclical disruptions. For investors, the bottleneck in production capacity is precisely where pricing power is concentrated.</p><p></body></html></p>\n</article>\n</div>\n</body>\n</html>\n","type":0,"thumbnail":"https://static.tigerbbs.com/03e38a3a3c63bd5a9d8d8ca2d384d1c5","relate_stocks":{"IE00BVYPNW00.USD":"GUINNESS GLOBAL EQUITY INCOME \"C\" (USD) ACC","SG9999015986.USD":"LIONGLOBAL DISRUPTIVE INNOVATION \"I\" (USD) ACC","IE0009356076.USD":"JANUS HENDERSON GLOBAL TECHNOLOGY AND INNOVATION \"A2\" (USD) ACC","LU0348723411.USD":"ALLIANZ GLOBAL HI-TECH GROWTH \"A\" (USD) INC","LU0476273544.USD":"CT (LUX) I GLOBAL TECHNOLOGY \"BU\" (USD) ACC","LU2023250330.USD":"ALLIANZ INCOME AND GROWTH \"AMG\" (USD) INC","LU1720051017.SGD":"Allianz Global Artificial Intelligence AT Acc H2-SGD","LU1917777945.USD":"安联专题基金Cl AT Acc","LU0553294199.USD":"BGF GLOBAL EQUITY INCOME \"A5G\" (USD) INC","LU1244550221.USD":"FRANKLIN GLOBAL MULTI-ASSET INCOME \"A\" (USDHEDGED) INC (M)","LU2242650005.HKD":"FIDELITY FUNDS GLOBAL MULTI ASSET DYNAMIC \"A\" (HKD) ACC","LU0057025933.USD":"SUSTAINABLE GLOBAL THEMATIC PORTFOLIO \"AX\" (USD) ACC","IE00BQXX3D17.EUR":"GUINNESS GLOBAL INNOVATORS \"C\" (EUR) ACC","LU0964807845.USD":"ALLIANZ INCOME & GROWTH \"A\" (USD) INC","LU2211815571.USD":"ALLIANZ POSITIVE CHANGE \"AT\" (USD) ACC","LU1720051108.HKD":"ALLIANZ GLOBAL ARTIFICIAL INTELLIGENCE \"AT\" (HKD) ACC","LU0784385170.HKD":"BGF GLOBAL MULTI ASSET INCOME \"A6\" (HKDHGD) INC","LU1852331112.SGD":"Blackrock World Technology Fund A2 SGD-H","IE00BQXX3C00.GBP":"GUINNESS GLOBAL INNOVATORS \"C\" (GBP) ACC","IE00BQXX3F31.USD":"GUINNESS GLOBAL INNOVATORS \"C\" (USD) ACC","IE00B19Z9P08.USD":"LEGG MASON CLEARBRIDGE US AGGRESSIVE GROWTH \"A\" (USD) INC","LU2108987350.USD":"UBS (LUX) EQUITY SICAV GLOBAL OPPORTUNITY SUSTAINABLE (USD) \"P\" (USD) ACC","LU2063271972.USD":"富兰克林创新领域基金","BK4543":"AI","LU1242518931.SGD":"Fullerton Lux Funds - Asia Absolute Alpha A Acc SGD","LU2244417387.USD":"FIDELITY SUSTAINABLE US EQUITY \"A\" (USD) ACC","LU1989772840.SGD":"CPR Invest - Climate Action A2 Acc SGD-H","LU1935043536.SGD":"MANULIFE GF GLOBAL MULTI-ASSET DIVERSIFIED INCOME \"AA\" (SGDHDG) INC A","LU0784383803.USD":"BGF GLOBAL MULTI-ASSET INCOME FUND \"A\" (USD) INC A","LU0861579265.USD":"联博低波幅策略股票基金A","LU0345768153.USD":"NINETY ONE GSF GLOBAL STRATEGIC MANAGED \"A\" (USD) ACC","LU1989772923.USD":"CPR Invest - Climate Action A2 Acc USD-H","LU1934455277.USD":"AB SICAV I LOW VOLATILITY TOTAL RETURN EQUITY PORT \"AD\" (USD) INC","LU2298321311.HKD":"BGF CIRCULAR ECONOMY \"A\" (HKDHDG) ACC","LU2764262908.HKD":"BGF GLOBAL UNCONSTRAINED EQUITY \"A2\" (HKD) ACC","LU1989764664.SGD":"CPR Invest - Global Disruptive Opportunities A2 Acc SGD-H","LU2023250504.SGD":"Allianz Thematica Cl AMg DIS H2-SGD","LU1989764748.USD":"东方汇理环球颠覆性机遇A2 Acc","LU0323591593.USD":"SCHRODER ISF QEP GLOBAL QUALITY \"A\" (USD) ACC","LU0198837287.USD":"UBS (LUX) EQUITY SICAV - USA GROWTH \"P\" (USD) ACC","LU1934455194.USD":"AB SICAV I LOW VOLATILITY TOTAL RETURN EQUITY PORT \"A\" (USD) ACC","LU2092937221.SGD":"Blackrock Circular Economy A2 SGD-H","IE00BDGV0183.EUR":"GUINNESS GLOBAL EQUITY INCOME \"C\" (EUR) INC","IE0034235303.USD":"PINEBRIDGE US RESEARCH ENHANCED CORE EQUITY \"A\" (USD) ACC","LU0256863811.USD":"ALLIANZ US EQUITY \"A\" INC","LU2054465674.USD":"UBS (LUX) KEY SELEC SICAV DIGITAL TRANSFORMATION T \"P\" (USD) ACC","IE00BJJMRY28.SGD":"Janus Henderson Balanced A Inc SGD","LU0215105999.USD":"SCHRODER ISF GLOBAL EQUITY \"A\" ACC","LU0868494708.USD":"UBS (LUX) EQUITY SICAV - US TOTAL YIELD SUSTAINABLE \"P\" (USD) INC","LU2403377893.USD":"ALLIANZ SELECT INCOME AND GROWTH \"AM\" (USD) INC","SG9999001424.SGD":"United E-Commerce Fund SGD","IE00B1BXHZ80.USD":"Legg Mason ClearBridge - US Appreciation A Acc USD","IE00BKDWB100.SGD":"PINEBRIDGE US LARGE CAP RESEARCH ENHANCED \"A5H\" (SGDHDG) ACC","LU0225283273.USD":"SCHRODER ISF GLOBAL EQUITY ALPHA \"A\" (USD) ACC","LU2250418816.HKD":"BGF WORLD TECHNOLOGY \"A\" (HKD) ACC","LU1064131342.USD":"Fullerton Lux Funds - Global Absolute Alpha A Acc USD","BK4554":"元宇宙及AR概念","IE00BGHQDM52.EUR":"GUINNESS ASIAN EQUITY INCOME \"C\" (EUR) ACC","IE00BJTD4V19.USD":"NEUBERGER BERMAN US LONG SHORT EQUITY \"A1\" (USD) ACC","LU0203345920.USD":"SCHRODER ISF QEP GLB ACT. VL \"A\" (USD) ACC","AVGG":"2倍做多AVGO ETF-Leverage Shares","LU1153585028.USD":"BGF GLOBAL LONG-HORIZON EQUITY \"A4\" (USD) INC","LU1232071149.USD":"AZ FUND 1 GLOBAL GROWTH SELECTOR \"AAZ\" (USDHDG) ACC","LU1674673691.USD":"HSBC GIF GLOBAL LOWER CARBON EQUITY \"AD\" (USD) INC","IE00BJLML261.HKD":"HSBC GLOBAL EQUITY INDEX \"HCH\" (HKD) ACC","AVGU":"2倍做多AVGO ETF-GraniteShares","IE00BGHQF631.EUR":"GUINNESS GLOBAL EQUITY INCOME \"C\" (EUR) ACC","IE00B3S45H60.SGD":"Neuberger Berman US Multicap Opportunities A Acc SGD-H","LU1301847155.USD":"BGF GLOBAL MULTI-ASSET INCOME FUND \"A4G\" (USD) INC","LU1674673428.USD":"HSBC GIF GLOBAL LOWER CARBON EQUITY \"AC\" (USD) ACC","IE00B3PB1722.GBP":"GUINNESS GLOBAL EQUITY INCOME \"C\" (GBP) INC","LU2456880835.USD":"ALLIANZ GLOBAL INCOME \"AT\" (USD) ACC","LU0942090050.USD":"UBS (LUX) EQUITY SICAV - US TOTAL YIELD SUSTAINABLE \"P\" (USD) INC","AVGW":"Roundhill AVGO WeeklyPay ETF","IE00B19Z9Z06.USD":"Legg Mason ClearBridge - US Aggressive Growth A Acc USD","LU0154236417.USD":"BGF US FLEXIBLE EQUITY \"A2\" ACC","IE00B42XCP33.USD":"GUINNESS GLOBAL EQUITY INCOME \"C\" (USD) INC","AVGX":"2倍做多AVGO ETF-Defiance","LU2125154778.USD":"ALLSPRING GLOBAL EQUITY ENHANCED INCOME \"A\" (USD) INC","LU0345769128.USD":"NINETY ONE GSF GLOBAL EQUITY \"A\" (USD) ACC","BK4551":"寇图资本持仓","LU0345769631.USD":"NINETY ONE GSF GLOBAL EQUITY \"A\" (USD) INC","LU1069344957.HKD":"AB SICAV I - AMERICAN GROWTH PORTFOLIO \"AD\" (HKD) INC","LU2764263039.SGD":"BGF GLOBAL UNCONSTRAINED EQUITY \"A2\" (SGDHDG) ACC","IE0004445015.USD":"JANUS HENDERSON BALANCED \"A2\" (USD) ACC","LU1951198990.SGD":"Natixis Thematics AI & Robotics Fund H-R/A SGD-H","AVL":"2倍做多AVGO ETF-Direxion","LU1951200564.SGD":"Natixis Thematics AI & Robotics Fund R/A SGD","IE00BKVL7J92.USD":"Legg Mason ClearBridge - US Equity Sustainability Leaders A Acc USD","LU2764263203.CNY":"BGF GLOBAL UNCONSTRAINED EQUITY \"A2\" (CNYHDG) ACC","IE00BWXC8680.SGD":"PINEBRIDGE US LARGE CAP RESEARCH ENHANCED \"A5\" (SGD) ACC","LU0345770993.USD":"NINETY ONE GSF GLOBAL STRATEGIC EQUITY \"A\" (USD) INC","LU0006306889.USD":"SCHRODER ISF US LARGE CAP \"A\" (USD) INC AV","LU1923623000.USD":"Natixis Thematics AI & Robotics Fund R/A USD","LU0683600562.USD":"AB SELECT US EQUITY \"A\" (USD) ACC","LU1814569148.SGD":"WELLINGTON GLOBAL QUALITY GROWTH \"D\" (SGDHDG) ACC","LU1691799644.USD":"Amundi Funds Polen Capital Global Growth A2 (C) USD","LU0965509283.SGD":"AB LOW VOLATILITY EQUITY PORTFOLIO \"AD\" (SGDHDG) INC","LU0672654240.SGD":"FTIF - Franklin US Opportunities A Acc SGD-H1","LU0170899867.USD":"EASTSPRING INVESTMENTS WORLD VALUE EQUITY \"A\" (USD) ACC","SG9999015952.SGD":"LIONGLOBAL DISRUPTIVE INNOVATION \"I\" (SGD) ACC","LU0079474960.USD":"联博美国增长基金A","LU2041044095.USD":"Blackrock Circular Economy A2 USD","IE00BJJMRX11.SGD":"Janus Henderson Balanced A Acc SGD","LU2756315664.SGD":"ALLIANZ INCOME AND GROWTH \"AMI\" (SGDHDG) INC","IE00BN8TJ469.HKD":"FTGF CLEARBRIDGE TACTICAL DIVIDEND INCOME \"A\" (HKD) INC","LU1935043023.USD":"MANULIFE GF GLOBAL MULTI-ASSET DIVERSIFIED INCOME \"AA\" (USD) INC A","IE00B4JS1V06.HKD":"JANUS HENDERSON BALANCED \"A2\" (HKD) ACC","LU1316542783.SGD":"Janus Henderson Horizon Global Technology Leaders A2 SGD","LU1242518857.USD":"FULLERTON LUX FUNDS - ASIA ABSOLUTE ALPHA \"I\" (USD) ACC","IE00B775SV38.USD":"NEUBERGER BERMAN US MULTICAP OPPORTUNITIES \"A\" (USD) ACC","LU2430703095.HKD":"WELLINGTON MULTI-ASSET HIGH INCOME \"AM4\" (HKD) INC","LU1551013425.SGD":"Allianz Income and Growth Cl AMg2 DIS H2-SGD","IE00B894F039.SGD":"Legg Mason ClearBridge - US Aggressive Growth A Acc SGD-H","LU2746668461.USD":"MANULIFE DYNAMIC LEADERS \"AA\" (USD) ACC","IE00B5949003.HKD":"JANUS HENDERSON GLOBAL TECHNOLOGY AND INNOVATION \"A\" (HKD) ACC","LU2430703178.SGD":"WELLINGTON MULTI-ASSET HIGH INCOME \"AM4H\" (SGDHDG) INC","LU0211327993.USD":"TEMPLETON GLOBAL EQUITY INCOME \"A\" (USD) ACC","LU0642271901.SGD":"Janus Henderson Horizon Global Technology Leaders A2 SGD-H","LU0345768740.USD":"NINETY ONE GSF GLOBAL STRATEGIC MANAGED \"A\" (USD) INC","LU2430703251.USD":"WELLINGTON MULTI-ASSET HIGH INCOME \"AM4\" (USD) INC","LU2089985449.USD":"MANULIFE GF GLOBAL SEMICONDUCTOR OPPORTUNITIES \"AA\" (USD) ACC","LU0795875169.SGD":"JPMorgan Investment Funds - Global Income A (div) SGD-H","LU2360106780.USD":"BGF WORLD TECHNOLOGY \"A4\" (USD) INC","LU2756315318.SGD":"ALLIANZ INCOME AND GROWTH \"AMG\" (SGDHDG) INC A","LU2360108059.USD":"BGF CIRCULAR ECONOMY \"A4\" (USD) INC","LU2931357623.SGD":"MANULIFE GF GLOBAL SEMICONDUCTOR OPPORTUNITIES \"AA\" (SGDHDG) ACC","AVS":"1倍做空AVGO ETF-Direxion","LU2746668974.SGD":"MANULIFE DYNAMIC LEADERS \"AA\" (SGDHDG) ACC","SG9999002232.USD":"Allianz Global High Payout USD","LU1003077747.HKD":"BGF GLOBAL EQUITY INCOME \"A6\" (HKDHDG) INC","SG9999002224.SGD":"Allianz Global High Payout SGD","LU1127390331.HKD":"AB SICAV I - ALL MARKET INCOME PORTFOLIO \"A\" (HKD) ACC","LU1934455863.HKD":"AB SICAV I LOW VOLATILITY TOTAL RETURN EQUITY PORT \"A\" (HKD) ACC","LU2361044949.HKD":"WELLINGTON US QUALITY GROWTH \"A\" (HKD) ACC","LU2361044865.SGD":"WELLINGTON US QUALITY GROWTH \"A\" (SGDHDG) ACC","LU2462157665.USD":"ALLIANZ GLOBAL INCOME \"A\" (USD) INC","LU1244550494.USD":"FRANKLIN GLOBAL MULTI-ASSET INCOME \"A\" (USDHEDGED) ACC","LU1623119135.USD":"Natixis Mirova Global Sustainable Equity R-NPF/A USD","LU1712237335.SGD":"Natixis Mirova Global Sustainable Equity H-R-NPF/A SGD","LU0061474960.USD":"天利环球焦点基金AU Acc","LU2417539215.USD":"ALLIANZ GLOBAL INCOME \"AMF\" (USD) INC","LU0868494617.USD":"UBS (LUX) EQUITY SICAV - US TOTAL YIELD SUSTAINABLE \"P\" (USD) ACC","LU1974910355.USD":"Allianz Thematica Cl AMg DIS USD","LU2361045086.USD":"WELLINGTON US QUALITY GROWTH \"A\" (USD) ACC","IE0004445239.USD":"JANUS HENDERSON US FORTY \"A2\" (USD) ACC","LU2237443382.USD":"Aberdeen Standard SICAV I - Global Dynamic Dividend A MIncA USD","LU2211814178.USD":"ALLIANZ CLEAN PLANET \"AT\" (USD) ACC","LU2237443549.SGD":"Aberdeen Standard SICAV I - Global Dynamic Dividend A MIncA SGD-H","LU2355687059.USD":"NORDEA 1 GLOBAL IMPACT \"BP\" (USD) ACC","LU0124676726.USD":"AB SICAV I - SUSTAINABLE US THEMATIC PORTFOLIO \"A\" (USD) ACC","LU1366333091.USD":"FIDELITY GLOBAL FOCUS \"A\" (USD) ACC","LU2237443622.USD":"Aberdeen Standard SICAV I - Global Dynamic Dividend A Acc USD","LU0965508806.USD":"AB LOW VOLATILITY EQUITY PORTFOLIO \"AD\" (USD) INC","BK4533":"AQR资本管理(全球第二大对冲基金)","IE00B7KXQ091.USD":"Janus Henderson Balanced A Inc USD","LU2237443978.SGD":"Aberdeen Standard SICAV I - Global Dynamic Dividend A Acc SGD-H","LU0985320562.USD":"NORDEA 1 GLOBAL STARS EQUITY \"BP\" (USD) ACC","LU2286300806.USD":"Allianz Cyber Security AT Acc USD","LU0238689110.USD":"贝莱德环球动力股票基金","LU2322448791.USD":"ALLIANZ GLOBAL INTELLIGENT CITIES INCOME \"AMG\" (USD) INC","LU2322448957.HKD":"ALLIANZ GLOBAL INTELLIGENT CITIES INCOME \"AMG\" (HKD) INC","LU0545039389.USD":"BGF GLOBAL EQUITY INCOME \"A2\" ACC","LU0011850046.USD":"贝莱德全球长线股票 A2 USD","LU2461242641.AUD":"WELLINGTON US QUALITY GROWTH \"A\" (AUDHDG) ACC","LU0316494557.USD":"FRANKLIN GLOBAL FUNDAMENTAL STRATEGIES \"A\" ACC","LU0097036916.USD":"贝莱德美国增长A2 USD","LU0640476718.USD":"THREADNEEDLE (LUX) US CONTRARIAN CORE EQ \"AU\" (USD) ACC","IE00B1XK9C88.USD":"PINEBRIDGE US LARGE CAP RESEARCH ENHANCED \"A\" (USD) ACC","LU2236285917.USD":"ALLIANZ GLOBAL INCOME \"AMG\" (USD) INC","LU2860962120.EUR":"CPR INVEST - ARTIFICIAL INTELLIGENCE \"A2\" (EUR) ACC A","SG9999004303.SGD":"Nikko AM Shenton Global Opportunities SGD","LU0203347892.USD":"SCHRODER ISF QEP GLOBAL ACTIVE VALLUE \"A\" (USD) INC AV","LU2592432038.USD":"WELLINGTON MULTI-ASSET HIGH INCOME \"A\" (USD) ACC","IE0034235188.USD":"PINEBRIDGE GLOBAL FOCUS EQUITY \"A\" (USD) ACC","LU2237438978.USD":"Amundi Funds US Pioneer A2 (C) USD","LU0274383776.USD":"MANULIFE GF US SMALL CAP EQUITY \"AA\" (USD) INC","LU2473716301.USD":"ALLIANZ GLOBAL INTELLIGENT CITIES INCOME \"AMF\" (USD) INC","LU0719512351.SGD":"JPMorgan Funds - US Technology A (acc) SGD","TSM":"台积电","LU0320765059.SGD":"FTIF - Franklin US Opportunities A Acc SGD","LU2505996681.GBP":"WELLINGTON MULTI-ASSET HIGH INCOME \"AM4H\" (GBPHDG) INC","LU2463028550.USD":"AB SICAV I AMERICAN MULTI-ASSET PORTFOLIO \"A\" (USD) ACC","LU2023250843.SGD":"Allianz Thematica Cl AT Acc H2-SGD","LU2420271590.USD":"ALLIANZ SELECT INCOME AND GROWTH \"AT\" (USD) ACC","LU2505996509.AUD":"WELLINGTON MULTI-ASSET HIGH INCOME \"AM4H\" (AUDHDG) INC","LU2237957902.USD":"NIKKO AM GLOBAL EQUITY \"F\" (USD) ACC","LU0096362180.USD":"CT (LUX) I GLOBAL FOCUS \"DU\" (USD)","LU2543165471.USD":"E FUND (HK) GLOBAL QUALITY GROWTH \"A\" (USD) ACC","LU0353189763.USD":"ALLSPRING US ALL CAP GROWTH FUND \"I\" (USD) ACC","LU2471134952.CNY":"INVESCO GLOBAL EQUITY INCOME ADVANTAGE \"A\" (CNYHDG) INC","LU2237957811.SGD":"NIKKO AM GLOBAL EQUITY \"F\" (SGD) ACC","LU2471134879.HKD":"INVESCO GLOBAL EQUITY INCOME ADVANTAGE \"A\" (HKD) INC","LU0795875086.SGD":"JPMorgan Investment Funds - Global Income A (div) SGD","LU2471134523.USD":"INVESCO GLOBAL EQUITY INCOME ADVANTAGE \"A\" (USD) ACC","LU2458330169.SGD":"FRANKLIN SHARIAH TECHNOLOGY \"A\" (SGD) ACC","LU1935042215.USD":"MANULIFE GF GLOBAL MULTI-ASSET DIVERSIFIED INCOME \"AA\" (USD) INC A","LU0096364046.USD":"CT (LUX) I AMERICAN \"DU\" (USD) ACC","LU2247934214.USD":"FIDELITY FUNDS SUSTAINABLE FUTURE CONNECTIVITY \"A\" (USD) ACC","LU2471134796.USD":"INVESCO GLOBAL EQUITY INCOME ADVANTAGE \"A\" (USD) INC","IE00BFSS7M15.SGD":"Janus Henderson Balanced A Acc SGD-H","LU0943347566.SGD":"安联收益及增长平衡基金AM H2-SGD","LU0823434583.USD":"BNP PARIBAS US GROWTH \"C\" (USD) ACC","LU0210536198.USD":"JPM US GROWTH \"A\" ACC","LU2750360641.GBP":"INVESCO GLOBAL EQUITY INCOME ADVANTAGE \"A\" (GBPHDG) INC","LU2458330243.SGD":"FRANKLIN SHARIAH TECHNOLOGY \"A-H1\" (SGDHDG) ACC","LU0823434740.USD":"BNP PARIBAS US GROWTH \"C\" (USD) INC","LU2750360997.AUD":"INVESCO GLOBAL EQUITY INCOME ADVANTAGE \"A\" (AUDHDG) INC","LU2896262040.SGD":"JPM US GROWTH FUND \"A\" (SGD) ACC","LU0345770308.USD":"NINETY ONE GSF GLOBAL STRATEGIC EQUITY \"A\" (USD) ACC","LU1732800096.USD":"摩根大通环球收益基金A (irc)","LU2487616109.SGD":"JPM AMERICA EQUITY \"A\" (SGD) ACC","IE00BMPRXR70.SGD":"Neuberger Berman 5G Connectivity A Acc SGD-H","BK4566":"资本集团","LU0787776722.HKD":"AB SELECT US EQUITY PORTFOLIO \"A\" (HKD) ACC","LU0210528500.USD":"JPM AMERICA EQUITY \"A\" ACC","LU1267930490.SGD":"TEMPLETON GLOBAL EQUITY INCOME \"AS\" (SGD) INC A","LU0912757837.SGD":"JPMorgan Investment Funds - Global Income A (mth) SGD-H","LU1670627923.USD":"M&G (LUX) NORTH AMERICAN DIVIDEND \"A\" (USD) ACC","LU1323610961.USD":"UBS (LUX) EQUITY SICAV - LONG TERM THEMES (USD) \"P\" (USD) ACC","LU0069063385.USD":"SUSTAINABLE GLOBAL THEMATIC PORTFOLIO \"A\" (USD) ACC","LU0889565833.HKD":"FRANKLIN TECHNOLOGY \"A\" (HKD) ACC","LU2168564495.EUR":"AZ ALLOCATION - TREND \"AI\" (EUR) ACC","LU2065169927.USD":"M&G (LUX) GLOBAL MAXIMA \"A\" (USD) ACC","LU2168564222.USD":"AZ ALLOCATION - TREND \"AAZ\" (USDHDG) ACC","LU0689626769.HKD":"AB SICAV I - SUSTAINABLE US THEMATIC PORTFOLIO \"A\" (HKD) ACC","LU0106261372.USD":"SCHRODER ISF US LARGE CAP \"A\" ACC","LU1629891620.HKD":"ALLIANZ INCOME AND GROWTH \"AMG2\" (H2-HKD) INC","LU2168564065.EUR":"AZ ALLOCATION - TREND \"AAZ\" (EUR) ACC","LU1670711040.USD":"M&G (LUX) GLOBAL DIVIDEND \"A\" (USD) ACC","LU2168563687.JPY":"AZ ALLOCATION - TREND \"AAZ\" (JPYHDG) ACC","LU1935042488.USD":"MANULIFE GF GLOBAL MULTI-ASSET DIVERSIFIED INCOME \"AA\" (USD) INC","LU1778281490.HKD":"HSBC GIF GLOBAL LOWER CARBON EQUITY \"AD\" (HKD) INC","LU2168564149.EUR":"AZ ALLOCATION - TREND \"BAZ\" (EUR) ACC","IE00BKPKM429.USD":"NEUBERGER BERMAN GLOBAL SUSTAINABLE EQUITY \"A\" (USD) ACC","LU0251132253.USD":"FIDELITY FUNDS GLOBAL THEMATIC OPPORTUNITIES \"A\" (USD) ACC","LU0203202063.USD":"AB SICAV I - ALL MARKET INCOME PORTFOLIO \"A2X\" (USD) ACC","IE00BZ1G4Q59.USD":"LEGG MASON CLEARBRIDGE US EQUITY SUSTAINABILITY LEADER \"A\"(USD) INC (A)","LU0203201768.USD":"AB SICAV I - ALL MARKET INCOME PORTFOLIO \"AX\" (USD) INC","LU1732799900.SGD":"JPMorgan Investment Funds - Global Income A (irc) SGD-H","LU0353189680.USD":"富国美国全盘成长基金Cl A Acc","LU1804176565.USD":"EASTSPRING INV GLOBAL GROWTH EQUITY \"A\" (USD) ACC","SG9999015978.USD":"利安颠覆性创新基金A","LU0211328371.USD":"TEMPLETON GLOBAL EQUITY INCOME \"A\" (MDIS) (USD) INC","LU0784385840.USD":"Blackrock Global Multi-Asset Income A2 USD","BK4512":"苹果概念","LU0127658192.USD":"EASTSPRING INVESTMENTS GLOBAL TECHNOLOGY \"A\" (USD) ACC","LU2213496289.HKD":"ALLIANZ INCOME AND GROWTH \"AT\" (HKD) ACC","SG9999001440.SGD":"United Global Dividend Equity Fund A SGD Dist","LU2237443895.HKD":"abrdn SICAV I - GLOBAL DYNAMIC DIVIDEND \"A\" (HKD) ACC","LU1037948897.HKD":"AB LOW VOLATILITY EQUITY PORTFOLIO \"AD\" (HKD) INC","LU1815336760.USD":"THREADNEEDLE (LUX) GLOBAL TECHNOLOGY \"AUP\" (USD) INC","LU0820561909.HKD":"ALLIANZ INCOME AND GROWTH \"AM\" (HKD) INC","LU1037948541.HKD":"AB LOW VOLATILITY EQUITY PORTFOLIO \"A\" (HKD) ACC","LU0081259029.USD":"UBS (LUX) EQUITY FUND - TECH OPPORTUNITY \"P\" (USD) ACC","BK4515":"5G概念","LU0256863902.USD":"ALLIANZ US EQUITY \"AT\" (USD) ACC","LU0056508442.USD":"贝莱德世界科技基金A2","AVGO":"博通","LU2265009873.SGD":"Eastspring Investments - Global Growth Equity AS SGD-H","LU0689472784.USD":"安联收益及增长基金Cl AM AT Acc","LU0786609619.USD":"高盛全球千禧一代股票组合Acc","IE0005OL40V9.USD":"JANUS HENDERSON BALANCED \"A6M\" (USD) INC","LU1992135472.HKD":"ALLIANZ GLOBAL INTELLIGENT CITIES \"AT\" (HKD) ACC","BK4585":"ETF&股票定投概念","LU2237443465.HKD":"abrdn SICAV I - GLOBAL DYNAMIC DIVIDEND \"A\" (HKD) INC","IE00BZ9MQY76.HKD":"FTGF CLEARBRIDGE US AGGRESSIVE GROWTH \"A\" (HKD) ACC","LU0210533765.USD":"JPM GLOBAL GROWTH \"A\" (USD) ACC","LU0234570918.USD":"高盛全球核心股票组合Acc Close","LU0061475181.USD":"THREADNEEDLE (LUX) AMERICAN \"AU\" (USD) ACC","LU0708995401.HKD":"FRANKLIN U.S. OPPORTUNITIES \"A\" (HKD) ACC","LU0820561818.USD":"安联收益及增长平衡基金Cl AM DIS","LU0726765562.USD":"JPM GLOBAL INCOME \"A\" (USD HEDGED) INC","LU2133065610.SGD":"JPMorgan Investment Funds - Global Dividend A (mth) SGD","LU1551013342.USD":"Allianz Income and Growth Cl AMg2 DIS USD","BK4588":"碎股","LU0289739343.SGD":"SUSTAINABLE GLOBAL THEMATIC PORTFOLIO \"A\" (SGD) ACC","LU2347655073.USD":"JPM GLOBAL INCOME \"A\" (USDHDG) INC A","LU0080751232.USD":"富达环球多元动力基金A","SG9999011175.SGD":"Nikko AM Global Dividend Equity Dis SGD-H","LU0234572021.USD":"高盛美国核心股票组合Acc","LU0957808578.USD":"THREADNEEDLE (LUX) GLOBAL TECHNOLOGY \"ZU\" (USD) ACC","IE00BMPRXQ63.HKD":"NEUBERGER BERMAN NEXT GENERATION CONNECTIVITY FUND \"A\" (HKDHDG) ACC","LU1244550577.SGD":"FTIF - Franklin Global Multi-Asset Income A (Mdis) SGD-H1","LU1868837300.USD":"CT (LUX) I AMERICAN FUND \"9\" (USD) ACC","LU2087625088.SGD":"ALLSPRING US ALL CAP GROWTH \"A\" (SGDHDG) ACC","IE00BLSP4239.USD":"Legg Mason ClearBridge - Tactical Dividend Income A Mdis USD Plus","IE00BMPRXN33.USD":"NEUBERGER BERMAN 5G CONNECTIVITY \"A\" (USD) ACC","LU1868836914.USD":"CT (LUX) I AMERICAN \"3\" (USD) ACC","LU1868837136.USD":"CT (LUX) I AMERICAN \"8\" (USD) ACC","BK4612":"AI芯片","LU1548497426.USD":"安联环球人工智能AT Acc","LU1868836591.USD":"CT (LUX) I AMERICAN \"1U\"(USD) ACC","LU2264538146.SGD":"Fullerton Lux Funds - Global Absolute Alpha A Acc SGD","LU2279689827.SGD":"JPMorgan Investment Funds - Global Income Sustainable A (mth) SGD-H","LU2347655156.SGD":"JPMorgan Investment Funds - Global Income A (icdiv) SGD-H","LU1868836757.USD":"CT (LUX) I AMERICAN FUND \"2\" (USD) ACC","LU0957791311.USD":"THREADNEEDLE (LUX) GLOBAL FOCUS \"ZU\" (USD) ACC","LU1815333072.USD":"THREADNEEDLE (LUX) GLOBAL FOCUS \"AUP\" (USD) INC","IE00BBT3K403.USD":"LEGG MASON CLEARBRIDGE TACTICAL DIVIDEND INCOME \"A(USD) ACC","SG9999003800.SGD":"Nikko AM Global Dividend Equity Acc SGD-H","LU0053666078.USD":"摩根大通基金-美国股票A(离岸)美元","LU0082616367.USD":"摩根大通美国科技A(dist)","LU1035775433.USD":"AB SICAV I - AMERICAN GROWTH PORTFOLIO \"AD\" (USD) INC","LU1803068979.SGD":"FTIF - Franklin Technology A (acc) SGD-H1","IE00BLSP4452.SGD":"Legg Mason ClearBridge - Tactical Dividend Income A Mdis SGD-H Plus","LU0949170772.SGD":"Blackrock Global Equity Income A6 SGD-H","LU2272731782.SGD":"Allianz Global Intelligent Cities AM Dis H2-SGD","BK4605":"半导体精选","BK4575":"芯片概念","LU2272731600.USD":"Allianz Global Intelligent Cities AM Dis USD","LU0417517546.SGD":"Allianz US Equity Cl AT Acc SGD","LU2083900584.USD":"HSBC GIF US INCOME FOCUSED \"AM2\" (USD) INC","LU0472753341.HKD":"SUSTAINABLE GLOBAL THEMATIC PORTFOLIO \"A\" (HKD) ACC","LU0738911758.USD":"Blackrock Global Equity Income A6 USD","LU2242649171.HKD":"FIDELITY FUNDS GLOBAL THEMATIC OPPORTUNITIES \"A\" (HKD) ACC","LU2360032135.SGD":"ALLSPRING GLOBAL EQUITY ENHANCED INCOME \"A\" (SGDHDG) INC","IE00BK4W5L77.USD":"HSBC GLOBAL FUNDS ICAV US EQUITY INDEX \"HC\" (USD) ACC","IE00BK4W5M84.HKD":"HSBC GLOBAL FUNDS ICAV US EQUITY INDEX \"HC\" (HKD) ACC","LU0949170426.SGD":"Blackrock Global Multi-Asset Income A6 SGD-H","LU0784384876.USD":"Blackrock Global Multi-Asset Income A6 USD","LU2125154935.USD":"ALLSPRING (LUX) WF GLOBAL EQUITY ENHANCED INCOME \"I\" (USD) INC","IE00B775H168.HKD":"JANUS HENDERSON BALANCED \"A5M\" (HKD) INC","IE00BN29S564.USD":"JANUS HENDERSON BALANCED \"A3\" (USD) INC","IE00BFSS8Q28.SGD":"Janus Henderson Balanced A Inc SGD-H","LU2272731865.HKD":"ALLIANZ GLOBAL INTELLIGENT CITIES INCOME \"AM\" (HKD) INC","BK4581":"高盛持仓","LU1670628061.USD":"M&G (LUX) NORTH AMERICAN DIVIDEND \"A\" (USD) INC","BK4598":"佩洛西持仓","LU1670710588.SGD":"M&G (LUX) GLOBAL DIVIDEND \"A\" (SGD) ACC","BK4141":"半导体产品","LU0979878070.USD":"FULLERTON LUX FUNDS - ASIA ABSOLUTE ALPHA \"A\" (USD) ACC","LU1670710661.SGD":"M&G (LUX) GLOBAL DIVIDEND \"A\" (SGD) INC","LU2065170008.USD":"M&G (LUX) GLOBAL MAXIMA \"A\" (USD) INC","LU0109391861.USD":"富兰克林美国机遇基金A Acc","LU0289961442.SGD":"SUSTAINABLE GLOBAL THEMATIC PORTFOLIO \"AX\" (SGD) ACC","LU2357305700.SGD":"Allianz Global Artificial Intelligence ET H2-SGD","LU1267930730.SGD":"富兰克林美国机遇基金AS Acc SGD (CPF)","LU1670711123.USD":"M&G (LUX) GLOBAL DIVIDEND \"A\" (USD) INC","SGXZ23171101.USD":"NIKKO AM SHENTON GLOBAL OPPORTUNITIES (USD) ACC","LU0310799852.SGD":"FTIF - Templeton Global Equity Income A MDIS SGD","LU0661504455.SGD":"Blackrock Global Equity Income A5 SGD-H","LU1366192091.USD":"ALLIANZ US EQUITY PLUS \"AM\" (USD) INC","LU0048584097.USD":"FIDELITY FUNDS GLOBAL THEMATIC OPPORTUNITIES \"A\" (USD) INC","LU0466842654.USD":"HSBC ISLAMIC GLOBAL EQUITY INDEX \"A\" (USD) ACC","LU1162221912.USD":"FRANKLIN INCOME \"A\" (USD) ACC","IE0001KFT4U8.USD":"FTGF CLEARBRIDGE GLOBAL GROWTH LEADERS \"A\" (USD) INC","LU1280957306.USD":"THREADNEEDLE (LUX) US CONTRARIAN CORE EQUITIES \"AUP\" (USD) INC","LU1988902786.USD":"FULLERTON LUX FUNDS GLOBAL ABSOLUTE ALPHA \"I\" (USD) ACC","LU2602419157.SGD":"HSBC ISLAMIC GLOBAL EQUITY INDEX \"AC\" (SGD) ACC","LU0444973449.USD":"CT (LUX) I GLOBAL TECHNOLOGY \"DU\" (USD) ACC","LU1642822529.SGD":"THREADNEEDLE (LUX) GLOBAL TECHNOLOGY \"A\" (SGD) ACC","LU1145028129.USD":"ALLIANZ INCOME AND GROWTH \"AQ\" (USD) INC","SGXZ81514606.USD":"大华环球创新基金A Acc USD","LU1914381329.SGD":"Allianz Best Styles Global Equity Cl ET Acc H2-SGD","LU0157215616.USD":"FIDELITY GLOBAL FOCUS \"A\" INC","LU2065171311.SGD":"M&G (LUX) GLOBAL MAXIMA \"A\" (SGD) ACC","LU0320765646.SGD":"FTIF - Franklin Income A MDIS SGD-H1","LU2065171402.SGD":"M&G (LUX) GLOBAL MAXIMA \"A\" (SGD) INC","IE00BJTD4N35.SGD":"Neuberger Berman US Long Short Equity A1 Acc SGD-H","LU0511384066.AUD":"SUSTAINABLE GLOBAL THEMATIC PORTFOLIO \"A\" (AUDHDG) ACC","LU1992135399.USD":"Allianz Global Intelligent Cities AT Acc USD","LU2720916845.USD":"BGF GLOBAL UNCONSTRAINED EQUITY \"A2\" (USD) ACC","LU0109392836.USD":"富兰克林科技股A","LU0820562030.AUD":"ALLIANZ INCOME AND GROWTH \"AMH2\" (AUDHDG) H2 INC","LU0187121727.USD":"FIDELITY SUSTAINABLE US EQUITY \"A\" (USD) INC","LU0354030511.USD":"ALLSPRING U.S. LARGE CAP GROWTH \"I\" (USD) ACC","SG9999015945.SGD":"LionGlobal Disruptive Innovation Fund A SGD","LU0965509010.AUD":"AB LOW VOLATILITY EQUITY PORTFOLIO \"AD\" (AUDHDG) INC","LU0354030438.USD":"富国美国大盘成长基金Cl A Acc","IE00BYV24P56.USD":"GUINNESS EMERGING MARKETS EQUITY INCOME \"C\" (USD) ACC","IE00BMCWC346.EUR":"GUINNESS EMERGING MARKETS EQUITY INCOME \"C\" (EUR) ACC","IE00BVYPNV92.GBP":"GUINNESS GLOBAL EQUITY INCOME \"C\" (GBP) ACC","LU0444971666.USD":"天利全球科技基金","SGXZ99366536.SGD":"United Global Innovation A Acc SGD-H","LU2106854487.HKD":"ALLIANZ THEMATICA \"AMG\" (HKD) INC","IE00BVYPNQ40.USD":"GUINNESS ASIAN EQUITY INCOME \"C\" (USD) ACC","LU0965509101.SGD":"AB LOW VOLATILITY EQUITY PORTFOLIO \"A\" (SGDHDG) ACC","SGXZ51526630.SGD":"大华环球创新基金A Acc SGD","IE00BVYPNP33.GBP":"GUINNESS ASIAN EQUITY INCOME \"C\" (GBP) ACC","LU1935042991.SGD":"MANULIFE GF GLOBAL MULTI-ASSET DIVERSIFIED INCOME \"AA\" (SGDHDG) INC"},"source_url":"https://wallstreetcn.com/articles/3769285","is_english":false,"share_image_url":"https://static.laohu8.com/e9f99090a1c2ed51c021029395664489","article_id":"2625964592","content_text":"博通高管点名AI供应链三大核心瓶颈:激光器、先进制程晶圆及PCB。受制于技术门槛与产能挤压,小型PCB交货周期已暴增至六个月,激光器良率不足30%。即便台积电现大规模扩产,因设备交期达12至18个月、2026年产能实际已被大厂锁定,新订单需排队至2027年,算力缺口将趋于常态化。人工智能算力基础设施的供给侧约束,正从芯片前道制造向光学元件与先进封装材料全面蔓延。博通高管首度点名AI供应链三大瓶颈,揭示这场算力军备竞赛的真正卡点远比市场普遍认知的更为深层,且短期内难以消解。博通实体层产品营销总监 Natarajan Ramachandran 于3月24日在台北举行的媒体见面会上指出,AI相关供应链当前面临三大核心瓶颈:激光器产能、晶圆(特指台积电先进制程),以及PCB(Paddle Card,印刷电路板)。其中,用于高速光收发器内部的小型PCB交货周期已从约六周骤增至约六个月,预计要到2027年才能缓解。上述表态对市场的直接意义在于:AI基础设施的投资热潮并不能自动化解供给侧的结构性约束。从激光器严苛测试下良率不足30%,到台积电先进封装初期单位产出低迷,再到PCB供应商切换认证周期长达六个月以上——多重瓶颈相互叠加,意味着算力产能缺口极可能以结构性方式延续,供应链涨价或将趋于常态化。博通首席执行官 Hock Tan 在3月财报会议上亦确认,博通已提前锁定2026年至2028年关键组件的供应,涵盖先进制程晶圆、高带宽内存(HBM)及基板。这一超前布局本身,正是当前供应紧张程度的直接写照。PCB交货周期暴涨十倍在800G/1.6T高阶光收发模组中,PCB是连接外部线缆与内部光电元件的关键接口。这类小型PCB由于空间极小且须处理极高频信号,通常采用mSAP(改良型半加成法)工艺,技术门槛远高于普通PCB,主要由具备高阶HDI或IC基板技术的厂商供应。PCB沦为瓶颈的根源在于工艺重叠。其mSAP制程与AI服务器所需的IC基板制程存在部分交集,当全球抢购HBM产能时,小型PCB的产能随之遭到挤压。与此同时,1.6T模组对信号品质要求极为严苛,PCB须采用超低损耗材料与精密阻抗控制,并非一般PCB厂商所能承接。更关键的是,一旦更换供应商,认证周期长达六个月以上。这正是谷歌、Meta等超大规模云厂商宁愿签订三至四年长期合约、也要锁定既有供应商产能的原因。激光器:良率不足三成,磷化铟产能成核心卡点激光器元件已成为CPO(共封装光学)时代的另一重大瓶颈。为支撑1.6T乃至更高带宽,激光器须在数据中心高温环境下保持波长稳定,对\"超高功率\"且\"极低噪声\"的连续波(CW)激光有严苛要求。即便供应商能够产出激光晶粒,经严苛可靠性测试后,符合CPO高标准要求的良率可能不足30%。产能端的约束同样严峻。高功率激光器依赖磷化铟(InP)技术,而全球具备6英寸InP大规模量产能力的厂商屈指可数。若上游InP外延片厂商或 Coherent、Lumentum 等拥有自有产能的厂商订单爆满,下游无论有多少封装厂,均无激光晶粒可用。更深层的结构性压力来自CPO架构本身对激光器需求的放大效应。在传统光模组中,一个模组配置一个激光器;而在CPO方案中,为降低热影响,业界转向使用ELSFP(外部激光光源模组)架构,导致激光晶粒需求量与交换机数量之间不再是线性关系,而是成倍数增长,直接冲击原本就已紧张的InP外延产能。晶圆与先进封装:真正的\"超级大堵车\"在后道在晶圆供应方面,Natarajan Ramachandran直接表示\"台积电产能达到极限\",预计台积电先进制程产线将在2026年形成瓶颈,尽管台积电计划持续扩产至2027年。然而,真正的\"超级大堵车\"发生在后道先进封装环节。进入CPO时代,台积电须导入COUPE(紧凑型通用光子引擎)技术,通过混合键合(Hybrid Bonding)将光学芯片与硅芯片进行立体堆叠。这种全新封装技术难度极高、测试周期极长,导致设备初期单位产出(UPH)难以快速提升。竞争格局进一步加剧了产能压力。2026年,博通面对的产能竞争对手不再只是传统网络通信厂商,而是英伟达、苹果、AMD、高通,以及正在重金自研ASIC芯片的谷歌、Meta、OpenAI。当最顶尖的AI算力芯片与最高阶的1.6T网络交换器同时涌入台积电同一条产线,产能实质上已进入\"配给制\"。即便台积电现在决定大规模扩产,厂房建设、无尘室竣工、引入ASML极紫外光(EUV)光刻设备及各类高端测试设备的交货周期动辄十二至十八个月。这意味着2026年的产能,实际上在2024至2025年间便已被各大厂锁定——现在才追加订单的客户,只能等到2027年新产能释放。全链条外溢:二线供应商扩产滞后,瓶颈蔓延产能压力正向整个供应链外溢。先进封装并不仅仅是封装厂的事,真正容易形成卡点的环节包括:CoWoS必须配套的ABF基板、先进封装必备的底部填充胶(Underfill)、AI功耗爆炸带来的散热需求、KGD测试与老化测试(Burn-in)、CPO与光模组,以及TSV和中介层的切割与钻孔等。台积电董事长魏哲家曾表示\"CoWoS产能仍然不够\"——他缺乏的并非资金,而是配套供应商的产能:载板厂、探针卡厂商、底部填充胶供应商等。台积电可以投入巨资建设厂房,却无法迫使这些中小供应商在短期内将产能翻倍。ABF基板扩产动辄需要两至三年,老化测试时间极长,光纤阵列对位容差在次微米级、难以完全自动化——每一个环节都在拖慢整体节奏。随着英伟达持续推进GPU架构的硬件迭代,供应链瓶颈与涨价问题或将成为结构性常态而非周期性扰动。对投资者而言,产能卡点所在,正是定价权集中之处。","news_type":1,"symbols_score_info":{"AVGO":1.95,"AVGW":0.6,"AVL":0.6,"TSM":1.87,"AVS":0.6,"AVGG":0.6,"AVGX":0.6,"AVGU":0.6}},"isVote":1,"tweetType":1,"viewCount":1506,"authorTweetTopStatus":1,"verified":2,"comments":[],"imageCount":0,"langContent":"EN","totalScore":0}],"defaultTab":"following","isTTM":true}